Steel work is complete and the building has been lowered on to new beams with large wood (PSL) posts under West gable. These posts will support a
steel balcony and allowed us to lower the building without having to
frame all of the walls. Under slab drain lines will be covered with
more stone and insulation installed prior to pouring slab.
No comments:
Post a Comment