The lower beams (the tracks) are now shown installed running north south and the Barn has been moved along them to the North. All of the cribbing that sits outside the Barn will be taken down and the barn will rest on six interior cribs and the steel beams. This will allow us to dig for the new foundation. The next step is to raise the Barn another two feet and then the digging begins.
Outstanding engineering work!
ReplyDelete