Under tension!




After a week of preparation the barn is under tension and now fully supported by the steel beams and cribbing. You can see the sill no longer sits on the concrete foundation. 6 hydraulic jacks did the work and the total lift was 63 tons. 20 tons of steel and a 40 ton barn.